PELATIHAN ENHANCED OIL RECOVERY AND WATERFLOOD
ENHANCED OIL RECOVERY AND WATERFLOOD
PELATIHAN ENHANCED OIL RECOVERY AND WATERFLOOD

Deskripsi
Oil recovery operations traditionally have been subdivided into three stages: primary, secondary and tertiary. These stages described the production from a reservoir in achronological sense. Primary production resulted from the displacement energy naturally existing in reservoir. Secondary recovery usually implemented after primary production declined, the term secondary recovery is now almost synonymous with waterflooding. Tertiary recovery was that obtained after waterflooding (or whatever secondary process used) it’s used miscible gases, chemicals and/or thermal energy to displace additional oil. When the waterflooding stage might be reasonably be bypassed the term tertiary recovery fell into disfavor in petroleum engineering term and the designation of enhanced oil recovery (EOR) become accepted to replace the term of secondary and tertiary recovery.
In describing the different EOR processes (Waterflooding, Miscible Displacement, Chemical Flooding: Micellar/Polymer, Surfactant, Alkaline and finally Thermal Recovery Processes, it will be focused on the fundamental concepts of each processes and it will also present methods of predicting oil recovery when the processes are applied to oil reservoir. Many methods are available to calculate displacement performance, ranging from simple models based on volumetric sweep to sophisticated method. Thus, with the proper understanding of all enhanced oil recovery processes will reduce the entire cost of the plant and production operation of EOR system. This four-day training will provide a comprehensive knowledge and understanding of different EOR processes (Waterflooding, Miscible Displacement, Chemical Flooding: Micellar/Polymer, Surfactant, Alkaline) and Thermal Recovery Processes with various fields example.
TUJUAN PELATIHAN ENHANCED OIL RECOVERY AND WATERFLOOD
* Refresh the knowledge of the participants on reservoir engineering and enhanced oil recovery (EOR) processes.
* Understand the fundamental concepts of each EOR process and ability to calculate and to predict the EOR performance.
* Learn the simple EOR models based on volumetric sweep model to sophisticated method of calculation.
* Enhance the knowledge on EOR processes (Waterflooding, Miscible Displacement, Chemical Flooding: Micellar/Polymer, Surfactant, Alkaline) and Thermal Recovery Processes with various fields example.
* Gain additional knowledge on EOR processes (Waterflooding, Miscible Displacement, Chemical Flooding: Micellar/Polymer, Surfactant, Alkaline) and Thermal Recovery Processes. Knowledge sharing among the and instructor.
PESERTA PELATIHAN ENHANCED OIL RECOVERY AND WATERFLOOD
The following category of professionals should attend:
* FreshPetroleum, Reservoir, Production and Facility/Process Engineer
* Geoscientist
* AssetManagement Team members and Business Development Manager
* Production Operators, Technician, Maintenance and Operation Personnel who is responsible for the EOR processes design and implementation
* Experienced professional who wants to r e f r e s h o r b r o a d e n t h e i r understandingof EOR Processes & technology
* Other professionals who want a better understanding of the subject
Outline Training
Day 1
1. Introduction to EOR Processes
* Definition of EOR
* TargetOil Resources for EOR Processes
* Idealized Characteristics of an EOR Processes
* Potential of Different Processes
* Screening Criteria for Process Applicability
2. Microscopic Displacement of Fluids in a Reservoir
* Capillary Forces and Viscous Forces
* PhaseTrapping
* Mobilization of Trapped Phases-Alteration of Viscous/Capillary Force Ratio
3. Displacement in Linear System
* Waterflood Performance – Frontal Advanced Equation
* Viscous Waterflood in a Linear System
* Chemical Flooding in Linear System
* Application of Chemical Flooding Model
* Displacement of Slugs
* Dispersion During Miscible Displacement
* Viscous Fingering – Instability in
* Displacement Fronts
Day 2
4. Macroscopic Displacement of Fluids in a Reservoir
* Volumetric Displacement Efficiency and Material Balance
+ Definition and Discussion of Mobility Ratio
+ AreaDisplacement Efficiency
+ Vertical Displacement Efficiency
+ Volumetric Displacement Efficiency
5. Mobility-Control Processes
* Process Description
+ Physical and Chemical Characteristics of Polymer
+ FlowPolymer Through Porous Media
+ In-SituPermeability Modification
+ Mobility Control to maintain Chemical Slug Integrity
+ Foamas EOR Agent
+ WaterAlternating Gas (WAG) Process
Day 3
6. Miscible Displacement Processes
* General Description of Miscible Displacement
+ Principles of Phase Behavior in Miscible Displacement
+ First Contact Miscibility (FCM) and Multiple Contact Miscibility (MCM) Processes
+ Measurement and Prediction of Minimum Miscible Pressure (MMP) or Minimum Miscible Gas Enrichment (MME) in Multiple Contact Process
+ FluidProperties in Miscible Displacement
+ Miscible Displacement Modeling
7. Chemical Flooding
* Description of Micellar/Polymer Process
* Surfactants
* Phase Behavior of Microemultion and Inter Facial Tension(IFT)
* Variables Affecting Phase Behavior & IFT
* Viscosity and Density of Microemultion
* Displacement Mechanism
* Modeling, design Procedure and Criteria of?Chemical Flood Displacement
* Alkaline Flooding
Day 4
8. Thermal Recovery Processes
* HeatLosses During Steam Injection
* CyclicSteam Stimulation
* Reservoir Heating by Steam Injection
* Estimating of Oil Recovery From Steam Drive
* In-Situ Combustion
* Comparison of Steam and In-Situ Combustion
METODE TRAINING
1. Presentation
2. Discuss
3. Case Study
4. Evaluation
5. Pre-Test & Post-Test
6. Games
Jadwal Diorama Training Tahun 2026
- Januari : 20-21 Januari 2026
- Februari : 24-25 Februari 2026
- Maret : 05-06 Maret 2026
- April : 23-24 April 2026
- Mei : 19-20 May 2026
- Juni : 23-24 Juni 2026
- Juli : 23-24 Juli 2026
- Agustus : 27-28 Agustus 2026
- September : 15-16 September 2026
- Oktober : 20-21 October 2026
- November : 17-18 November 2026
- Desember : 15-16 December 2026
Catatan: Jadwal tersebut dapat disesuaikan dengan kebutuhan calon peserta. Peserta dapat mengajukan tanggal pelaksanaan pelatihan. Sebelum melakukan booking tiket perjalanan maupun hotel mohon untuk menghubungi marketing kami terlebih dahulu. Kesalahan pemesanan tiket terkait jadwal tanpa surat konfirmasi (Confirmation Letter) bukan merupakan tanggung jawab tim Diorama Training.
LOKASI PELATIHAN
REGULER TRAINING
- Yogyakarta, Hotel Fortuna Grande Malioboro (6.000.000 IDR / participant)
- Jakarta, Hotel Amaris Kemang La Codefin (6.500.000 IDR / participant)
- Bandung, Hotel Neo Dipatiukur (6.500.000 IDR / participant)
- Bali, Hotel Ibis Kuta (7.500.000 IDR / participant)
- Lombok, Hotel Jayakarta (7.500.000 IDR / participant)
- Surabaya, Hotel Neo Gubeng (7.500.000 IDR / participant)
ONLINE TRAINING VIA ZOOM
INVESTASI PELATIHAN
Investasi pelatihan selama tiga hari tersebut menyesuaikan dengan jumlah peserta (on call). *Please feel free to contact us.
Catatan: Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.
Benefit Apa Saja yang Didapatkan Peserta?
- FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara)
- FREE Transportasi Peserta ke tempat pelatihan (By Request)
- Module / Handout
- FREE Flashdisk
- Sertifikat
- FREE Bag or backpack (Tas Training)
- Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
- 2x Coffee Break & 1 Lunch, Dinner
- FREE Souvenir Exclusive
FAQ tentang CVDIOR.CO.ID
P : Berapa minimal running pelatihan ini ?
J : Pelatihan ini akan running idealnya minimal dengan 3 peserta, tetapi bisa disesuaikan dengan kebutuhan pesertaP : Apakah bisa jika saya hanya ingin pelatihan sendiri aja / private course ?
J : Bisa, kami akan membantu menyelenggarakan pelatihan 1 hari jika ada persetujuan dari klienP : Dimana saja pelatihan biasanya di selenggarakan?
J : Pelatihan kami selenggarakan di beberapa kota besar di Indonesia seperti Bandung, Jakarta, Yogyakarta, Surabaya, Malang, Bali, Lombok dan beberapa negara seperti Singapore dan MalaysiaP : Apakah bisa diselenggarakan selain di kota lain?
J : Penyelenggaraan pelatihan bisa diadakan di kota lain dengan minimal kuota 5 orang setiap kelasP : Apakah bisa juga diselenggarakan secara IHT/ In House Training di Perusahaan klien ?
J : Bisa diselenggarakan secara IHT di Perusahaan klienP : Apakah jadwal bisa disesuaikan dengan kebutuhan klien ?
J : Jadwal pelatihan dapat di sesuaikan dengan kebutuhan klien.Materi, Lokasi dan Jadwal Pelatihan Bisa Berubah Sewaktu-waktu dan disesuaikan Dengan Kondisi Peserta, dimohon untuk Melakukan Konfirmasi untuk Segala Bentuk Perubahan, agar Tidak Terjadi Miskomunikasi. Segera Daftarkan Pelatihan, Dapatkan Promo Menarik Bulan Ini.
Technorati Tags: training production optimization of oil & gas pasti jalan,training optimalisasi produksi migas pasti jalan,training pengenalan production of oil & gas pasti jalan,training gas well loading prediction pasti jalan,pelatihan production optimization of oil & gas pasti jalan,pelatihan optimalisasi produksi migas pasti running

